Review after China portable fire pump installation

China portable fire pump is an important equipment. After installation, it does not mean to let it go. In addition to trial use, it also needs to be rechecked. Only after repeated inspection can we use the pump safely. What rechecks should be done after the pump is installed?

1. It is required that the position, size and elevation of the foundation of China portable fire pump shall meet the design requirements, and the anchor bolts must be properly and correctly fixed in the concrete foundation without missing parts, damage or corrosion.

2. According to the characteristics of the conveyed medium, the materials of main parts, shaft seals and gaskets shall be checked if necessary.

https://www.woqfirepump.com/fire-fighting-truck-pump-jbq108-6-h-product/

3. Leveling and alignment shall comply with relevant regulations.

4. The installation of all pipes and fittings connected to China portable fire pump and the cleaning requirements of lubricating oil pipes shall comply with the standards.

5. Do a good job in the early stage to ensure that the fire pump can operate efficiently, the service life of the flow passage parts of the pump is relatively long, and the production cost is saved. The whole working condition system operates stably and will not affect the work of the whole system because of the pump operation problems.

We can see the importance of rechecking after the installation of the fire pump. For the operation of the whole pump, we should not only avoid the occurrence of faults, but also ensure that its operation efficiency becomes higher. To achieve this, we need to do a good job in rechecking.