What are the installation requirements of horizontal China Portable fire pump

Horizontal fire pump and other types of fire pump is the main difference in the appearance of the structure of the different form, the user can directly distinguish, it is used in the installation, there will be some differences, such as the installation needs to meet the following requirements.China Portable fire pump

1. Check that the pump is in good condition before installation.

2. The horizontal fire pump should be installed as close to the water source as possible.

3. There are two ways to install the pump and the base. One is the rigid connection China Portable fire pumpdirectly installed on the cement foundation, and the other is the flexible connection installed by JGD shock absorber.

4. Direct installation can be placed on the basis of the pump pad high 30~40 mm (ready for filling cement slurry), and then correction, and wear anchor bolts, fill cement mortar, after 3~5 days of cement dry, re-correction, until the cement completely dry, tighten the nuts of anchor bolts.China Portable fire pump

5. When installing the pipeline, the inlet and outlet pipelines should have their own supports. The flange of the pump should not bear too much weight of the pipeline.

https://www.woqfirepump.com/fire-equipment-fire-fighting-helmet-product/

6. Horizontal fire pump is used for suction range occasions, the inlet pipe should be equipped with a bottom valve, and the inlet and outlet pipeline should not have too many bends, and there should be no water leakage, air leakage phenomenon.

7. The inlet pipe should be equipped with a filter screen to prevent impurities from entering the impeller. The effective area of the filter screen should be 3 ~ 4 times the area of the inlet pipe to ensure the free flow of liquid.

8. For the convenience and safety of maintenance and use, a regulating valve is installed on the inlet and outlet pipelines of the horizontal fire pump and a pressure gauge is installed near the pump outlet to ensure the operation within the rated range and ensure the normal operation and service life of the pump.

9. If the inlet needs to expand the diameter connection, please choose the eccentric reducer pipe joint.

When installing different specifications and types of fire pumps, we must pay attention to the different installation methods and installation requirements, so as to better ensure the installation quality and improve the use effect.